Work · Surroundings of Martos castle
Renewing the networks and laying granite paving in three streets of the historic quarter of Martos
In three streets of the historic quarter of Martos, beside the Torre del Homenaje and the Torre Almedina, we renewed the sewers, the water supply and the street lighting and replaced the paving with granite setts and slabs.

Objective
Calle Almedina, Calle Castillo and Calle Primero de Mayo form the Fortaleza Baja quarter of Martos, around the Torre del Homenaje and the Torre Almedina. The quarter lies within the historic quarter, declared an Asset of Cultural Interest in 2005. The project, part of the Junta de Andalucía’s La Ciudad Amable programme, called for renewing the buried networks, which were obsolete, and replacing a stone-flag paving laid in 2000 with one in keeping with the historic quarter, giving priority to pedestrians.
Difficulties
- Narrow, lived-in streets. One stretch of Calle Almedina cannot take machinery, and the works had to disrupt the residents’ daily life as little as possible.
- All the networks in very little width. Sewerage, water supply, electricity and telecommunications had to fit under the same street. In Calle Almedina the project gathers them in a shared trench.
- Old, undocumented networks. Before starting, nobody knew which way several houses drained. Two dead-end stretches have a 2.50 m fall, sloping towards the closed end.
- Protected subsoil. As this is a historic quarter, the earthworks were carried out under archaeological monitoring, authorised by the regional culture department.
Solution
Before starting, we walked the streets with the site direction, took levels and gathered what the residents knew about where their houses drained. With that information and the topographic survey, the position of the manholes and the direction of each stretch of sewer were fixed. Where houses drain towards the rear, it was agreed to leave the new connection ready at the façade, with its chamber.
We lifted the existing paving and opened the trenches, which the project defines as 0.60 to 0.70 m deep. In them we laid 298.10 m of sewer in PVC pipe of 315 to 400 mm, 345.73 m of water main in polyethylene and 202.40 m of ducting for electricity and telecommunications. The ducting is left empty, with its chambers, so that the utility companies can later remove the cables clipped to the façades.
The base is, according to the project, a reinforced HA-25 concrete slab 15 cm thick. The paving is all bush-hammered grey Quintana granite. In the centre of the street are 10 × 10 × 10 cm setts, which recall the old cobbles of Martos. Along the edges, a band of 60 × 40 cm slabs marks the pedestrian space with no change of level.
The street lighting was renewed with 20 luminaires. The project defines them as classic lanterns with a colour temperature of 2,000 K, to meet the conditions of the Sierra Sur de Jaén Starlight reserve. The resting areas were fitted with two masonry benches clad in granite, with a planter and LED lighting, and two single benches with timber-slat seats.
Result
The site direction certified in March 2022 that the works were carried out between May and November 2021 in accordance with the conditions. The photographs from November show the streets already paved, with the manhole covers and gullies set flush with the setts.
Before

Street beside the tower before the works 
Narrow stretch before the works
During the works

Services trench in the stretch with no access for machinery 
Chamber and buried ducting for electricity and telecommunications 
Setts laid around a manhole
After

Finished granite sett paving
Drawings and diagrams

Proposal drawing from the project

