Work · AVRA houses in Alcalá del Río

Underpinning the foundations of three terraced houses with micropiles

Three terraced houses were cracking because the foundation at the end of the row had settled. We underpinned them from inside with 50 micropiles 15 m long and reinforced-concrete beams cast against the existing foundation.

Location
Alcalá del Río (Seville)
Year
2025–2026
Client
Andalusian Housing and Rehabilitation Agency (AVRA)
Design and site management
Eduardo Martínez Moya · Edartec Consultores
Type of work
Special foundations · Structural strengthening · Rehabilitation
Tracked micropile drilling rig with its mast raked, working inside a house beside a column and the foundation wall.
Micropile drilling rig inside the house, July 2025

Objective

The Andalusian Housing and Rehabilitation Agency (AVRA) owns a group of terraced houses built in 1988 in Alcalá del Río. From 2019 cracks appeared in the first three of the row, and repairs to the walls did not stop them. Their foundations had to be underpinned, the structure strengthened and the houses then repaired.

Difficulties

  • A shallow, eccentric foundation. The houses rest on strip footings 0.70 m wide and 0.40 m deep over a layer of gravel, with plastic marly clays beneath. At the end of the row, the footing of the first house is eccentric to the wall and barely reaches 10 cm into natural ground. According to the project’s geotechnical study, the ground gave way under that footing, which rotated and dragged the adjoining houses with it, since they share walls and foundations.
  • Working inside the houses. The footings can only be reached from inside. To get to them, the suspended ground floor and the staircase of each house had to be demolished and openings made in the façade for the drilling rig.
  • A shared structure. The fourth house had no damage, but it shares its foundation with the third. The project included its first bay so that the strengthening would be symmetrical.
  • Occupied homes. The tenants were rehoused during the works. The start, planned for April 2025, was put back twice until the last house was vacated.

Solution

The project and the site direction are by the architect Eduardo Martínez Moya, of Edartec Consultores. The solution keeps the existing foundation and adds a new, deeper one that takes up its loads.

After clearing the ground floors, we cast reinforced-concrete beams of 40 × 50 cm on both sides of each existing footing, under the party walls and under the piers and the central column of each house. The two beams of each pair are tied to each other and to the old footing with 16 mm through-bars every 50 cm, set in epoxy resin. At the gable wall of the first house, the most damaged, the beam was built from the pavement and measures 40 × 110 cm.

Those beams rest on 50 micropiles 150 mm in diameter and 15 m long, raked at 15°. Under the party walls they are set in pairs, one on each side, so that they cross beneath the old footing. We drilled them with our own rig from inside the houses, reinforced them with steel tube and grouted them with cement grout at a water/cement ratio of 0.50. The grout was tested in a laboratory: 25.7 N/mm² at 7 days.

With the underpinning finished, a new ground-floor slab of prestressed joists was built and a frame of HEB 120 sections was erected to consolidate the north-east façade. The staircases were then rebuilt, the cracks in the walls stitched, and the finishes, joinery and services of the four houses reinstated.

Result

The works were completed on 23 February 2026, the date of the final certificate. On the same day AVRA took them over, according to the handover certificate, “completed and to its satisfaction”, with no list of defects. The loads of the walls and columns of the three houses, and of the first bay of the fourth, now go down through the new beams to the 15 m micropiles.

Before

During the works

After

Drawings and diagrams

Sheet 05 Contact

Let’s talk

Tell us about your problem or project. For enquiries in English, please write to us by email.

+34 953 291 886info@toledanoedifica.com

Contact and office hours